Studies that compare commercial photovoltaic modules and wind turbines for a dormitory-scale load under a clear roof-area limit are scarce. This study evaluates rooftop photovoltaic (PV) and wind-turbine options for a prospective grid-connected renewable energy supply system that can power the KFUPM student-housing dormitories in Dhahran, Saudi Arabia. The solar PV and windturbine systems were sized to meet the dormitory annual electricity demand of 48 GWh based on the rooftop area available for PV deployment, which was limited to 153,796 m². RETScreen Expert was used to model three monocrystalline PV modules (Trina 600 W, Jinko 595 W, and JA Solar 545 W) and three wind-turbine candidates (AAER A-2000-100, Enercon E-101, and Vestas V90-3.0 MW). The PV results showed that rooftop solar power alone could almost match the annual dormitory demand. All PVmodule options resulted in a similar capital cost of US$20.95–US$21.12 million and simple payback of approximately 5.3 years when calculated under a net-zero billing framework. Among the three options, the Jinko module exhibited the highest efficiency; therefore, it requires the smallest roof area and lowest capital cost while still meeting the demand target. The wind turbines produced 51,665–52,821 MWh/year and showed clear differences in financial performance. Among the wind turbines considered, Enercon E-101 achieved the shortest payback (4.9 years) and best cost-to-performance ratio when matched to the load. Overall, this study identified Jinko Solar and Enercon E-101 as the preferred technology candidates for standalone or hybrid deployment to meet the energy requirements of the student-housing dormitories.
Journals System - logo
Scroll to top