ORIGINAL ARTICLE
Figure from article: Feasibility of Using Solar...
 
KEYWORDS
TOPICS
ABSTRACT
This study evaluates the techno-economic and environmental feasibility of integrating a grid-connected solar photovoltaic (PV) system to decarbonize natural gas compressor stations along Saudi Arabia’s East-West pipeline. The objective of this study is to assess whether solar PV can reliably offset the station’s annual electricity demand of 23,520 MWh while maintaining economic viability. The System Advisor Model (SAM) software was utilized to simulate two representative locations, Abqaiq and Al-Duwadimi, under fixed tilt and single-axis tracking configurations. All systems were sized to meet and slightly exceed the required demand over a 25-year lifetime, while exporting the excess energy produced to the grid. Results show that single-axis tracking delivers similar Year-1 AC energy with a smaller DC array, and under equal PV module capacity, it produces higher annual AC output than fixed-tilt systems. Seasonality variability leads to higher grid-imported energy during low-irradiance periods, while a 0.5%/year DC degradation causes a gradual decline in PV generation over time. Financial analysis under a net-zero billing framework illustrates a reduction of approximately 50% in payback time compared to conventional billing, with 1st year significant savings of $ 1.78–1.83 M and additional export revenues of $ 0.33–0.36 M. The calculated LCOE ranges from 2.94–3.62 (¢/kWh), with the Abqaiq single-axis scenario offering superior performance. Environmentally, displacing grid electricity with solar PV avoids 670,729–688,292 tons of CO₂ over the entire project’s lifecycle, while lifetime PV emissions represent only 1–1.5% of the avoided grid emissions, confirming a substantial net environmental benefit.
Journals System - logo
Scroll to top