HOW ECOLOGICAL ENGINEERING HELPED TO CONTINUE BUILDING AND UPGRADE OF THE OPOLE POWER PLANT
Jan Siuta 1,2
 
 
 
More details
Hide details
1
Instytut Ochrony Środowiska - PIB, ul. Kolektorska 4, 01-692 Warszawa
 
2
Honorowy Prezes Polskiego Towarzystwa Inżynierii Ekologicznej
 
 
Publication date: 2016-09-09
 
 
Corresponding author
Jan Siuta   

Instytut Ochrony Środowiska - PIB, ul. Kolektorska 4, 01-692 Warszawa
 
 
Inż. Ekolog. 2016; 49:1-7
 
KEYWORDS
TOPICS
ABSTRACT
Principles of ecological engineering were applied for upgrading the Opole Power Plant under construction, complete with modern installation to protect the environment. The modernized project was a subject of „Integrated environmental impact assessment of the Opole Power Plant” developed by the Institute of Environmental Protection in 1981. The main issues covered by the impact assessment were presented and discussed at the national scientific conference attended, among others, by the representatives of local community from Opole. The conference was organized by the Polish Society of Ecological Engineering on June 5 and 6, 1992. The main aim of the conference was to identify and deliver as broad as possible analysis of environmental conditions for designing, building and operating coal fired power plants. A secondary goal, though of main concern for the Opole agglomeration, was to evaluate many-sided environmental risks resulting from the construction and operation of the Power Plant. The feasibility of continuing the construction of a power generating facility that meets the requirements of the 21st century was demonstrated by the fact that the Opole Power Plant S.A. was awarded the ISO 14001 - Environmental Management System certificate by the British Standards Institution. Advanced construction of the two consecutive blocks of a combined power of 1800 MW in the Opole Power Plant substantiates the validity and effectiveness of the conference organized in 1992.
Journals System - logo
Scroll to top